Production optimization of sanding horizontal wells using a DAS sand monitoring system
In the case study outlined in this paper, the oil production rate was increased by 25% using a predictive pressure optimization workflow to minimize sand production in a horizontal, sand prone well.
Paper Number: SPWLA-2021-0001